As found through the figure down below, steady auger is accustomed to drill the borehole, elevate up drilled soil, and pour concrete while the auger is moved up. Consequently, the borehole does not need casing or hydrostatic stress to prevent harm to the borehole wall. Log in to TheConstructor to https://hallet847dmw3.blogozz.com/profile